June 2023 Project Update

The structural steel columns are underway!

Construction Update.

Take a look at these progress photos of the steel framework that’s currently going up. Expected completion for structural steel is this summer. On the interior of the barge, the flooring system has been installed and concrete will be poured.


Design Updates.

The kitchen layout and equipment package has been finalized. In addition, interior selections are underway and the Club Level bar layout has been improved to create a lighter, and more airy feel. Take a look at the latest drawings from Kersting Architecture as well as a fly through rendering that incorporates some of the modifications and selections.

1st FLOOR - Restaurant and kitchen

2nd FLOOR - Club level, dining, bar and private room