The Commodore Club project is moving quickly. Take a look at some updates from the past few weeks!
INSIDE
Inside, water lines, and piping are being installed. Duct work installation through the first and second floor is underway, and air handlers have been placed in the barge. The barge’s first floor dining level concrete was poured.
ROOFING
Roof insulation has begun, and TPO installation is complete. They're continuing with flashing the roof curbs this week.
EXTERIOR
The second floor metal framing is complete while first floor framing continues. Exterior sheathing of the barge has begun.
MARINA
Site work at the Wrightsville Beach Marina has begun. The old, smaller pilings were removes, and the floating dock temporarily moved until the new, larger pilings are placed. The new pilings will be delivered mid-September.